
Copyright © 2025 KAP
Türkiye Sermaye Piyasaları-Merkezi Saklama ve Veri Depolama Kuruluşu
[CONSOLIDATION_METHOD_TITLE] | [CONSOLIDATION_METHOD] |
İlgili Şirketler Related Companies | [] | ||||||||
İlgili Fonlar Related Funds | [] | ||||||||
Türkçe Turkish | İngilizce English | ||||||||
oda_MaterialEventDisclosureGeneralAbstract| |
| ||||||||
oda_UpdateAnnouncementFlag| |
| Evet (Yes) | Evet (Yes) | ||||||
oda_CorrectionAnnouncementFlag| |
| Hayır (No) | Hayır (No) | ||||||
oda_DateOfThePreviousNotificationAboutTheSameSubject| |
| 21.12.2022- 12.05.2023- 15.06.2023- 05.09.2023 | 21.12.2022- 12.05.2023- 15.06.2023- 05.09.2023 | ||||||
oda_DelayedAnnouncementFlag| |
| Hayır (No) | Hayır (No) | ||||||
oda_AnnouncementContentSection| |
| ||||||||
oda_ExplanationSection| |
| ||||||||
oda_ExplanationTextBlock| | 21 Aralık 2022 tarihli Özel Durum Açıklamamız ile Şirketimizin bağlı ortaklığı Entek Elektrik Üretimi A.Ş tarafından, Elektrik Piyasasında Depolama Faaliyetleri Yönetmeliği kapsamında, depolama tesisi kurmak taahhüdü ile yaklaşık 1,5 GW ilave kapasite için Enerji Piyasası Düzenleme Kurumu'na (EPDK) gerçekleştirdiğimiz başvurular kapsamında, bugüne kadar toplam 397,7 MW için onay alındığı kamuya açıklanmıştı. Konuyla ilgili olarak EPDK tarafından yapılan açıklamada Malkara RES ve Mursallı RES olmak üzere sırasıyla 57,6 MW ve 72 MW kurulu gücünde depolamalı rüzgâr enerji santrali kurulumuna dair iki ön lisans başvurumuzun daha olumlu sonuçlandığı duyurulmuş olup, ön lisans alan projelerimizin toplam kurulu gücü 527,3 MW olmuştur. Değerlendirme süreci devam eden diğer ön lisans başvurularımıza ilişkin gelişmeler paylaşılmaya devam edilecektir. İşbu açıklamamızın İngilizce çevirisi KAP'da yer almakta olup, açıklama metinlerinde herhangi bir farklılık olması durumunda, Türkçe açıklama esas kabul edilecektir. | With our Material Event Disclosure dated December 21, 2022, it was announced to the public that our Company's subsidiary, Entek Elektrik Üretim A.Ş., has received approval for a total of 397.7 MW so far within the scope of their applications to the Energy Market Regulatory Authority (EMRA) for an additional capacity of approximately 1.5 GW with the commitment to establish a storage facility within the scope of the Regulation on Storage Activities in the Electricity Market. With the statement made by EMRA, it was announced that our two preliminary license applications for the installation of wind power plants with storage capacity of 57.6 MW and 72 MW, respectively, Malkara WPP and Mursallı WPP, were approved, and the total installed capacity of our pre-licensed projects has reached 527.3 MW. We will continue to share the developments regarding our other preliminary license applications whose evaluation process is ongoing. In case of a discrepancy between the Turkish and the English versions of this disclosure, the Turkish version shall prevail. |
Yukarıdaki açıklamalarımızın, Sermaye Piyasası Kurulu'nun yürürlükteki Özel Durumlar Tebliğinde yer alan esaslara uygun olduğunu, bu konuda/konularda tarafımıza ulaşan bilgileri tam olarak yansıttığını, bilgilerin defter, kayıt ve belgelerimize uygun olduğunu, konuyla ilgili bilgileri tam ve doğru olarak elde etmek için gerekli tüm çabaları gösterdiğimizi ve yapılan bu açıklamalardan sorumlu olduğumuzu beyan ederiz.