
Copyright © 2025 KAP
Türkiye Sermaye Piyasaları-Merkezi Saklama ve Veri Depolama Kuruluşu
[CONSOLIDATION_METHOD_TITLE] | [CONSOLIDATION_METHOD] |
İlgili Şirketler Related Companies | [] | ||||||||
İlgili Fonlar Related Funds | [] | ||||||||
Türkçe Turkish | İngilizce English | ||||||||
oda_MaterialEventDisclosureGeneralAbstract| |
| ||||||||
oda_UpdateAnnouncementFlag| |
| Hayır (No) | Hayır (No) | ||||||
oda_CorrectionAnnouncementFlag| |
| Hayır (No) | Hayır (No) | ||||||
oda_DateOfThePreviousNotificationAboutTheSameSubject| |
| 05.08.2024 | 05.08.2024 | ||||||
oda_DelayedAnnouncementFlag| |
| Hayır (No) | Hayır (No) | ||||||
oda_AnnouncementContentSection| |
| ||||||||
oda_ExplanationSection| |
| ||||||||
oda_ExplanationTextBlock| | Grup Şirketlerimizden Adaçal Endüstriyel Mineraller A.Ş.'ye ait Uşak ili Eşme ilçesindeki arazide kesin kabulü yapılan 6.000 kWe büyüklüğündeki güneş enerjisi santrali devreye alınmış ve elektrik üretimine başlamıştır. Şirket tarafından daha önce devreye alınan 2.000 kWe gücündeki iki GES tesisiyle birlikte toplam kurulu inverter gücü 8.000,- kWe'ye ulaşan üç adet GES santralinde yıllık bazda yaklaşık 14.000 – 14.500 MWh elektrik üretilerek, toplam elektrik tüketiminin %53 ‘lük kısmı güneş enerjisinden üretilen elektrik ile karşılanacaktır. Yapılan yatırım ile ayrıca 9.000 ton karbon salınımı engellenmesi öngörülmektedir. Anılan tesisin devreye alınması ile birlikte, Bera Holding Grup Şirketleri'nin sahip olduğu 44 MW gücündeki çağrı mektubunun 27 MW'lık kısmı yaklaşık 15,5 milyon USD yatırım tutarı ile devreye alınarak tamamlanmış olmaktadır. Kalan 17 MW'lık kısmın ise 2025 yılı sonuna kadar devreye alınması planlanmaktadır. Kamuoyunun Bilgisine sunarız. İşbu açıklama İngilizce olarak da yapılmış olup, açıklama metinlerinde herhangi bir farklılık olması durumunda Türkçe açıklama esas kabul edilecektir. | The 6,000 kWe solar power plant, whose final acceptance has been made, on the land in Eşme district of Uşak province belonging to one of our Group Companies, Adaçal Endüstri Mineraller A.Ş., has been commissioned and started to produce electricity. Approximately 14,000 - 14,500 MWh of electricity will be produced on an annual basis in three solar power plants with a total installed inverter power of 8,000 kWe, together with two 2,000 kWe solar power plants previously commissioned by the company, and 53% of the total electricity consumption will be met by electricity produced from solar energy. The investment is also expected to prevent 9,000 tons of carbon emissions. With the commissioning of the mentioned facility, 27 MW part of the 44 MW call letter owned by Bera Holding Group Companies has been commissioned and completed with an investment amount of approximately 15.5 million USD. The remaining 17 MW is planned to be commissioned by the end of 2025. Respectfully announced to the public. This statement has also been explained in Turkish, and in case of any differences in the explanation texts the Turkish explanation will be taken as basis. |
Yukarıdaki açıklamalarımızın, Sermaye Piyasası Kurulu'nun yürürlükteki Özel Durumlar Tebliğinde yer alan esaslara uygun olduğunu, bu konuda/konularda tarafımıza ulaşan bilgileri tam olarak yansıttığını, bilgilerin defter, kayıt ve belgelerimize uygun olduğunu, konuyla ilgili bilgileri tam ve doğru olarak elde etmek için gerekli tüm çabaları gösterdiğimizi ve yapılan bu açıklamalardan sorumlu olduğumuzu beyan ederiz.